A 120-room boutique hotel reduced bathroom renovation time by 60% using waterproof direct-bond wall panels.
Hotels & HospitalitySoutheast Asia
01
Boutique Hotel Bathroom Renovation
01 — Challenge
The challenge
The hotel needed to renovate all guest bathrooms during low season with minimal guest disruption. Traditional tile demolition and wet trades would have required closing the property for weeks.
02 — Solution
The solution
INNOMASTER waterproof panels were installed directly over existing ceramic tile using structural adhesive. Each bathroom was completed in less than one day.
03 — Results
Results
- 60% faster renovation vs. traditional tiling
- Zero demolition waste
- Consistent finish across all 120 rooms
- Property remained partially operational